Vykdomas projektas

Storage building

OBJEKTAS

Project for the construction of a storage building

STATYTOJAS

AB HISK

DARBU VADOVAS

Gediminas Švambari

NUORODA

NUORODA

DALINTIS

Aprašymas

The construction work of the warehouse building was focused on the creation of a durable, frost-resistant and robust infrastructure. First, work was carried out on the installation of a protective layer against frost, which ensures the resistance of surfaces to temperature fluctuations. They were followed by the preparation of the crushed stone base and the installation of the sieve layer — all these steps were carried out precisely to guarantee the stability of the soil. For environmental management, lawn edges and pavement (750 m²) were installed, and the final highlight was the installation of 1450 m² concrete street sidewalks on a C12/15 concrete base. With these works, not only a functional, but also an aesthetically tidy space was created.

Suteiktos paslaugos

Galerija

No items found.

Video medžiaga

Straipsnio iškarpa

Business Center ARTERY

Business Center ARTERY

Laying pavers

Laying pavers

Road construction

Road construction

Concreting works

Concreting works

Welfare works

Welfare works

Earthworks

Earthworks

Giraitė — Floodplain Road

Giraitė — Floodplain Road

Road construction

Road construction

Laying pavers

Laying pavers

Welfare works

Welfare works

Earthworks

Earthworks

Start your project with a reliable partner

Road construction, paving, engineering networks, concreting and more — all in one place. Get in touch and let's discuss your needs!

We use cookies to improve your experience on our website. By clicking “Accept All”, you agree to the use of all cookies.